From 17:00 on April 2 to 17:00 on April 3, the supply of hot water in the station area of the Zheleznodorozhny district will be stopped. Starting April 3, Quadra’s specialists will begin switching their electrical installations to summer operation. In a few days, apartment buildings will no longer be provided with heat. Heating will be turned off in social facilities – schools, clinics, kindergartens – at the request of the heads of institutions, starting from April 8. Today, preparation of generating and heating equipment for the new heating season will begin. They will check the maximum cooling temperature of the boiler circuit channels of the 113th quarter. “To do this, according to the current heat supply scheme, the temperature of the network water in the pipelines will be raised to maximum values. During testing – from 17:00 on April 2 to 17:00 on April 2. April 3 – it will be necessary to stop the supply of hot water at the Railway District stations. Centralized hydraulic tests of pipelines in all areas of the city will take place later. We will also inform you about the timing of these seasonal works,” noted Quadra. Photo: El open sources
0 комментариев