How to install columns on a terrace made of bent round timber with your own hands – Russia today Posting in CHAT: Russia If you want to build a terrace with bent round wood columns, there is a problem with their installation. The irregular geometry of such supports looks very interesting and advantageous against the background of a country house, but creates difficulties during installation. The proposed method allows you to install columns 100% reliably, evenly, and in addition, protects them from rotting. Materials: Dry bent round timber; wide steel strip; Tug M12; M12 nuts; nails; specific Column installation process The construction of a terrace begins with the installation of columns. The supports must be level and secure so that the ceiling can be secured to them. The curved round timber chosen for this must be dried and the bark removed from it. Weld a bracket for each post from a wide steel strip. It is made in the form of a staircase with two steps. Half of it will be concreted, and a round timber will be screwed to the protruding second. The width of the mounting bracket is 10-15 cm narrower than the cross-section of the post. In order for the prepared post to fit into the bracket, it must be trimmed. To do this, first align its lower end. If a crack appears on it, this part is sawn, then the excess thickness is cut off from the bottom of the column in the longitudinal direction on both sides to the length of the bracket. To avoid a crooked cut, plywood templates should be screwed to the round timber at the ends and sides. This will allow you to cut with a saw. It’s even easier to mark the cutting line with electrical tape and cut the bottom of the post with a chainsaw. If after sawing the bracket does not fit, you can slightly modify the cut using a grinder and a chisel. Please note that the stand must be filed so that 3-5 cm remains in front of the bracket jumper. It should hang. pillars, and not rest against the bottom. This will prevent the wood from getting wet and rotting. After preparing the lower end, the pole must be shortened at the top to the required length and a groove made for installing the ceiling. It is important to take into account that the round timber is curved, so the length is measured with a stretched rather than sagging tape measure. At the location of the terrace supports, it is necessary to concrete the brackets after the concrete has set. Columns are installed in them. They are aligned vertically with a pencil line and twisted with clamps with a pair of pins. The previously cut side walls of the columns are placed on top like overlays. They will close the bracket. To do this, blind holes are drilled into them for the nuts so that they fit tightly to the supports. You can secure the linings with a pair of nails with a sawed-off head, which will make them less noticeable. Supports installed in this way will not go anywhere. At the same time, they will not be constantly wet from below, so they will last even longer than a house to which a terrace is attached. Source link Source link
от
bonabo
117105
от
bonabo
114102
This year the improvement of the path and terrace near the canal with mandarin ducks will begin Posting in CHAT: Russia The Vladivostok administration has found a contractor who, according to the terms of the contract, must complete the second stage of improvement of the coast of the Solyonaya Canal, where tangerines nest, in the next two weeks. This is the same company that this year built a park on Cheremukhovaya, 8 and completed the construction of a public space on Ilyicheva. The contract was concluded with the only contractor who took part in the tender. It became Priming Engineering Corporation LLC. The founder of the company, Gegham Agamelyan, also owns Prim Dorstroy LLC - this company was included in the register of unscrupulous suppliers in 2020 for failing to repair the retaining wall on Tungusskaya. This year, in Vladivostok, the final construction of a park on Ilyicheva Street was completed and the first stage of the park was equipped at Cheremukhuvaya, 8. And in addition to the construction of a terrace next to the canal, they also accepted a contract. for another TOS project - to improve the territory in the area of houses No. 32, 34 and 38 on Neibut (implementation project “Contemplating the Golden Horn”). The contractor has a few weeks left on both projects - contracts until December 20. Moreover, there is quite a lot of concrete work and landscaping to be done on the Solyony Canal, which, apparently, will be postponed until the next season. Earlier, Elena Kholyavko, president of TOS Sputnik Vladivostok, said that the public association planned, as last year, to begin work in September and complete it by November. However, due to the late completion of financing and then procurement procedures, instead of transferring money directly to the TPS, everything was postponed to the end of the year. Source link Source link