The prosecutor’s office draws the attention of the governor of the Rostov region to shortcomings in work. Posting in CHAT: Russia According to the information portal 1RnD, the prosecutor of the Rostov region sent a letter to V. Golubev demanding that he carefully monitor the implementation of national projects. As explained in the control department, the implementation of the national projects “Healthcare”, “Culture”, “Housing and Urban Environment” in the Rostov region is progressing slowly with the identification of unscrupulous officials and entrepreneurs. For example, due to miscalculations in the preparation of assessment documentation, the conclusion of an agreement for the examination of a medical clinic in the Neklinovsky district was delayed for a long time. The letter also mentions other regions of the region where large inspections of medical institutions are carried out without meeting all established deadlines. One can also note the unfinished construction of water pipelines in the Myasnikovsky and Neklinovsky districts. It should be noted that since March 2024, the prosecutor’s office has been pointing out to the governor for the 16th time the problems in the Rostov region, in particular, the low quality of drinking water, violations in the construction of schools and kindergartens, roads, etc. as well as problems with the resettlement of emergency houses. Read us on Telegram: https://t.me/bloknot_taganrog Irina Kuznetsova Previously reported: Hope for the resumption of trolleybus traffic does not leave the residents of Taganrog 2619 News about Bloknot-Taganrog Source link Source link
от
bonabo
124112
от
Аноним
5947
A lot of shortcomings. • Russia today Posting in CHAT: RussiaThere was no calculation of the operation - the correspondence of the weight of the cargo to the boom radius, the permissible load of the crane at this radius. Either the offset is smaller, or the section is disconnected higher than what is here. Apparently they wanted it faster. But the situation was read without calculation. Although one might think that they probably saved money on the crane; it was needed with a larger lifting capacity. Sometimes the crawl leads to a very large hitch. But you can’t evaluate the crane’s characteristics from afar. At construction sites and installations such situations are not uncommon - you have to work close to the limits. Accurate calculation with the necessary margin saves. Here the crane itself is standing without tipping over (in the process, before the accident). Breaking the boom is not the same flight. Decides - the crane is closer, the boom has a shorter reach (lowering), the cable hook is higher on the mounted section. And the section can be reduced according to its weight, reach and load capacity. HOT EVENTS – we will show the world from the other side. Original source Source link