The Perm enterprise began serial deliveries of engine components for Angara launch vehicles


Posting in CHAT: Russia

The delivery included 21 sets of engine components and assemblies. In May of this year, Proton-PM manufactured JSC NPO Energomash 21 sets of components and assemblies of RD-191 engines for Angara launch vehicles. It is clarified that this is the first contract of the Perm enterprise for mass production of the main range Photo: “Proton-PM” The delivery set includes a turbopump, an oxidation-acceleration pump, an oxidation filter and a valve. pipeline with injector, heat protection and thermal insulation, special standards” The serial contract allowed Proton-PM to consolidate the technological process, thereby ensuring stability of production and quality of components for the new engine. Today we are developing manufacturing technology. Another key component of the RD-191 is the gas pipeline. In the future, we plan to master the final assembly of the engine at the modern production facilities of the enterprise in Novye Lyady,” said Ivan Krasnov, director of Proton-PM JSC. This was announced by the head of the Perm region Dmitry Makhonin. noted that a cluster for the production of rockets and aircraft engines is dynamically developing in the region. Local industrial enterprises produce competitive products, and the task of the regional government is to provide support for their production.

Source link

Source link


Кинуть ссылку- расшарить

98
Share via
98 голосов

0 комментариев

Ваш адрес email не будет опубликован. Обязательные поля помечены *

Leave the field below empty!

Авторизация
*
*
Регистрация
*
*
*

Leave the field below empty!

Генерация пароля