Quarantine due to a rabid dog was introduced in the village of Russkaya Builovka, Voronezh region. Posting in CHAT: Russia An outbreak of animal rabies was detected in a private farm on Svoboda Street in the village of Russkaya Buylovka, Pavlovsk district. The quarantine is set until May 28 inclusive. The corresponding decree was published on the portal of the regional government. The territory within a radius of up to 900 m, limited by Svoboda, Lesnaya, Stepnaya and Sovetskaya streets, was recognized as unsafe due to rabies. - The owner of the dog contacted the regional station for combating animal diseases after her death. Before this, the pet refused food and water, aggression and other manifestations of rabies were observed. The animal was not vaccinated, the Pavlovsk Animal Disease Control Station reported. During the rabies outbreak, experts vaccinated three cats, two dogs, as well as cattle and sheep. We have carried out disinfection. People who have been in contact with sick animals are now being vaccinated as a precaution. During the quarantine period, fairs, exhibitions and other events related to the movement and collection of animals susceptible to rabies are prohibited. This was previously reported by RIA Voronezh in January 2024. Four cases of rabies have been recorded in the region - in two cats and two dogs. Did you notice the error? Select it with the mouse and press Ctrl+Enter. Source link Source link
от
bonabo
117105
от
bonabo
147135
The first tenders have been announced for new interchanges, roads and repairs along Green Corner, Gorshkova, Russkaya, Patroklos Posting in CHAT: Russia The Vladivostok administration has published the first tenders for large-scale road work next year, some of which will take longer. The published documentation includes the exit from Neibut to the bypass highway and the construction of a new interchange on the Green Corner, the long-awaited first launch complex (of course, a road) on Patroklos, reconstruction of the intersection of Russian and 100th streets. The anniversary of Vladivostoksky Avenue, as well as the renewal of Admiral Gorshkov Street. Previously, all these projects were announced by the city administration, including in terms of receiving federal loans, but now they are looking for contractors for specific work. A total of 1,221,319,959 rubles have been allocated - only the first stages are sold for the most large-scale projects. In total, the most funds - 605.1 million rubles - will be spent on the road from the Zeleny Ugol, Green Boulevard and Neibut Street microdistricts to the bypass, as well as the construction of a new interchange on the Sedanka-Patroklo highway. We are talking only about the first stages of two separate (according to the documentation) projects, which essentially form one whole. So, for the first stage of construction of the interchange itself at Green Corner, 295,100,000 rubles were allocated - as VL.ru News previously wrote, this means a new exit from the bypass and a separate exit to the highway. At certain intersections, the project, approved back in 2018, provides for the installation of transitional express lanes. The first phase, scheduled for completion in 2024, also includes the installation of street lighting along the new road. Let us remind you that the construction of the first stage of the exchange was planned to begin in 2020, but it was not possible to find a contractor the first time, and the contract with the winner of the second tender was terminated by agreement of the parties. sides. In the second phase, it is planned to construct the entire interchange with flyovers, new connections to the area and other amenities. The first stage of developing the road to the new interchange - officially Neibut, 67a - will cost 310,000,000 rubles, but this route will cover both Green Corner and Green Boulevard. As News VL.ru previously wrote, the road from Neibut to the Sedanka-Patroclus highway was to be developed by the Smolensk company Interkarto, which developed the project for the interchange itself. However, the execution of this contract was terminated by agreement of the parties due to the occurrence of unforeseen circumstances - oddly enough, just a week ago, on November 23, budget money was not paid. So the new contractor will have to develop and approve design documentation before construction begins, before February 29. Construction and installation are scheduled to begin March 1. The length of the two-lane road will be 1.1 km. Let us note that from the car market to the Green Corner microdistrict there is now a road - built, by the way, by one of the developers, including on private land. All that remains is to extend it from Green Boulevard Street over the hill to the bypass road. They plan to spend 260 million rubles on the overhaul of the road to Admiral Gorshkov - from the intersection with Major Filipov Street to the transport interchange on the Sedanka-Patroclus highway. In general, a two-kilometer section will be repaired, along with the light bulbs. These works were already reported by News VL.ru, when the authorities were talking about Primorye receiving loans from the federal treasury. 218,638,314 rubles were allocated for the construction of the Patroclus Road. This is the so-called first launch complex of the road network. The total length of the constructed two-lane roads with a two-meter surface will be almost 2.7 km. In particular, we are talking about a 905-meter section of Arkhangelskaya Street - from Basargin to the neighboring section 25:28:030014:1304 (where a new school is being built). The Novorossiysk section is 291 meters long - from Basargin to the intersection with Sochinskaya. Also on the list is Sochinskaya Street in two sections: from Arkhangelskaya to the “transport interchange” (568 m) and from there to Novorossiysk (266 m). The intersection of Sochi and Severomorskaya, let us remind you, has been made circular since 2019 - now there are only traffic circles around pits dug by heat engines. The last objects are Severomorskaya (road 290 m) and the entrance to the first kindergarten built here from Arkhangelskaya (370 m). We have already told you that the administration of Vladivostok took over all Patroclus’s intra-block roads only in 2018. They promised to start asphalting in 2021, but the auctions of the city hall did not bring results - no one was found ready to build the road. the entire first launch complex for 167 million rubles. As a result, Vera Shcherbina, Chairman of the Government of Primorye, was the first to announce the receipt of federal loans for local roads. Finally, 137,581,645 rubles were allocated for major repairs of the road at the intersection of Russkaya Street and 100th Anniversary of Vladivostok Avenue. Attached to the documentation is a previously developed traffic control project, which was described in great detail in VL.ru News. According to him, the reconstruction of the facility will be carried out only on the first level, the second level - the bridge - will remain the same. As a result, the configuration of the intersection and the traffic pattern will change, several safety islands will appear, which will be curved and separate both approaching and passing traffic. Let us note that for all the objects listed above, judging by the drafts of future contracts, work should be completed by October 15, 2024. Let us remind you that earlier infrastructure projects were approved for six municipalities of the Primorsky Territory, what special budget loans are issued. In just two years, this is almost 7.8 billion rubles. Next year, 6.068 billion rubles will be received, of which 4.3 billion will go to Vladivostok. VL.ru news has already reported that this money will also be used to repair the educational building and the canteen of Lyceum No. 3 on the street. Glavnaya, 39 (former boarding school of the Burevestnik Lyceum), for which more than 637 million rubles were allocated. purchase of 16 new trolleybuses and their delivery to Vladivostok. It was also reported that they will continue to improve the embankment on Akhlestysheva - 70 million rubles have been allocated for bicycle paths and jogging tracks. The second stage of improvement of the Sportivnaya Gavan embankment should also take place - for 301 million rubles. Source link Source link
от
bonabo
129117
Residential complex “Russkaya” was put into operation without connection to water, electricity and heating Three new buildings in the residential complex “Forest Quarter 2” in Vladivostok were commissioned in September, but are not yet connected to the main utilities. There is no heating, no hot or cold water, and electricity is connected through a temporary line. The management company promises that the issue will be resolved in the near future, but does not specify exact timeframes. The delay is explained by the fact that the developer did not manage to formalize all the contracts with the organizations providing resources. The residential complex “Forest Quarter 2,” consisting of three panel ten-story buildings, began construction in 2019. LLC “Special Developer DV StroyTech” planned to deliver it in March 2023, but the permit for the operation of the building was obtained almost six months later. In mid-September, residents began to receive keys to their apartments. “I received the keys on October 3. However, it turned out that the utilities to the building were connected, but not turned on. It's still cold, there is no heating or hot water. There is cold water, but only for residents of the first two floors – it does not go higher. There is electricity, but, as we are told in the management company, it's temporary. That’s why the water pumps and elevators are not working,” says Ekaterina, owner of an apartment at Russkaya, 63l. “Residents are already renovating, some are in the process, some are finishing. The elevators are not working, so building materials have to be carried manually. It's tough for everyone, especially for residents of the upper floors. We pay extra to the movers for carrying materials, especially blocks and mixtures. “I personally carry a bucket of sand to the seventh floor when I get to my apartment,” says Mikhail, owner of an apartment at Russkaya, 63l. The management company “Sphere Housing and Utilities” also could not provide even approximate timeframes for connecting the buildings to the utilities. But they emphasized that the developer is doing everything possible to make it happen in the near future. “In September, the building received a permit for operation. However, activities to put the power supply, heating, and water supply systems into operation still need to be prepared. At the moment, the developer is doing this work. It often happens that the developer did everything physically, but there is a bureaucratic aspect. As for heating, a few weeks ago I contacted the District Heating Company to connect my building. In October, I received a response that our application was rejected because the developer did not provide a package of 19 documents. This includes coordination with Rostekhnadzor, act of delineation of balance sheet assets, act of meter agreement, technical conditions for connection. A similar situation with electricity – we have currently agreed on a temporary structure. But its capacity is certainly not enough for the elevators to operate,” explains the director of the Housing and Utilities Management Company, Evgeny Masyuk, adding, “Primvodokanal” has already supplied cold water, but without turning on the electric pumps, it cannot rise above the mark of the second floor. In Vladivostok administration responded to the request of the residents of the residential complex “Forest Quarter 2” that the acceptance of the buildings in September was carried out by the State Construction Supervision Committee and that the city administration does not have the authority to control the developer in character. The Government of the Primorsky Territory in its official response indicated that it is necessary to contact the State Housing Inspectorate of the Primorsky Territory. Residents intend to send collective appeals to all authorities in the near future. It is worth noting that “Farpost” currently published six offers for the sale of apartments in the “Forest Quarter 2” housing from 4.7 million to 5.8 million rubles, the average price per square meter – from 131 thousand to 164 thousand rubles. The fact that the houses have problems with water, electricity and heating is certainly not reported, as well as the fact that the new apartments, balconies, and entrances are flooded during rain. Source link Message Residential complex “Russkaya” was put into operation without connection to water, electricity and heating appeared first on Russia today. Source link