Video of explosions in Alushta appeared on the Internet – Russia today Posting in CHAT: Russia Messages appeared on the Internet about an attack by the Ukrainian Armed Forces on Crimea. According to the Telegram channel “Military Chronicle”, more than 10 missiles were fired at the peninsula. Apparently, we are talking about ATACMS missiles. Residents of Alushta write on social networks that they heard explosions. Explosions were reported in Perevalny, Gvardeyskoye, Dzhanki, Simferopol and Yevpatoriya. In addition, a video was published online showing a rocket or something else falling in the vicinity of Alushta. There are no official comments yet. Russian military experts claim that the Russian Armed Forces are already carrying out retaliatory strikes on Odessa with Onyx supersonic missiles and Iskander ballistic missiles. Source link Source link
от
bonabo
9179
от
Аноним
10290
In Alushta, a local resident was convicted of fraud in obtaining maternity capital. Posting in CHAT: RussiaThe court found that the woman, being the mother of two children, in October 2019 provided the territorial administration of the pension fund with deliberately false information about the disposal of maternity capital funds, which she allegedly used to pay off the debt spent on purchasing a plot of land in the Volgograd region. Thus, the defendant received more than 400 thousand rubles. In fact, the funds were used by her at her own discretion. The court agreed with the opinion of the state prosecutor about the guilt of the convict and sentenced her to a fine. The claim brought by the prosecutor to recover damages caused by the crime from the woman will be considered in civil proceedings. Based on materials from the Telegram channel “Prosecutor’s Office of the Republic of Crimea” Original source Source link
от
Аноним
195183
Work is underway to build a bypass road bypassing the city of Alushta, which will pass through the village of Izobilnoye with an exit outside the city limits. • Russia today Posting in CHAT: RussiaThe work is being carried out by the contractor JSC VAD. Due to the mountainous terrain of the area, it is planned to construct retaining retaining walls, as well as the construction of 2 transport interchanges at different levels and 9 artificial structures: a bridge over the Ulu-Uluzen River, 2 overpasses, a viaduct more than 178 meters long and 5 tunnel-type overpasses. The 7.8 km long road will have four lanes. The cost of construction of the facility is more than 22.4 billion rubles, the completion date is the end of November 2026. The preparatory stage is currently ongoing, which includes, among other things, the organization of traffic during the period of work, the preparation of construction sites, and the reconstruction of communication networks. Construction work is carried out in compliance with all environmental requirements. Based on materials from the Telegram channel “Aksyonov Z 82” Original source Source link